Platform

What an obligation asks the record for

A standard is a demand for particular records, in a particular form, by a date. This maps the demands we are asked about most onto the nine steps that already produce them — and then says, separately and more narrowly, how much of it we have actually built and for which product.

01

An obligation is a records demand with a date on it

Read as a feature list, a standard is unanswerable — it appears to require a system per standard. Read as a records demand, most of it is already a by-product of running the scheme: the facts an auditor or a competent authority asks for are produced by steps the operation performs anyway, provided each was captured once, at the step that produced it, rather than assembled afterwards from systems that were never designed to be compared.

The mapping below runs in one direction only. It says which step produces the fact an obligation asks for. It does not say that we file that obligation on your behalf, or that holding the fact is the same as satisfying the requirement — the section after it is the honest account of the difference.

The EUDR rows are Article 9's information requirements. The right-hand column names a step on the chain, not a module.
What the obligation asks forThe step that already produces it
Geolocation of every plot where the commodity was produced, with the date or time range of production — EUDR Art. 9Plan and plant — the block and season a later record can point at
The quantity, as net mass — EUDR Art. 9Harvest and grade — lots, with the block they came from
The name and address of whoever supplied you, and of whoever you supplied — EUDR Art. 9Register, then Pack and consign — custody, unbroken across the handover
Adequately conclusive evidence that the commodity was produced in accordance with the law of the country of production — EUDR Art. 9Apply — who chose the product and the dose, and the interval that follows
A due diligence statement, lodged before the goods are placed on the EU marketEvidence — a pack whose every figure names the record it came from
The practice records behind a GLOBALG.A.P. IFA auditApply, and Harvest and grade
That an advance reached the producer and was recovered on stated termsAdvance, Net and Settle

02

How much of that is actually built, and for which product

The table above is a mapping. This is coverage, and it is deliberately narrower, because the two are the easiest things in this market to conflate — and conflating them is how a vendor comes to sell against a standard it has written no code for.

Two distinctions carry most of the difference. The first is which product: the deforestation work is built on the livestock side, where the subject of a statement is an animal or a batch, and there is no crop equivalent today. The second is filing: producing a pack and lodging it with an authority are separate obligations, and we do only the first.

  • A grazing polygon held as geometry, per site, on the serverDoneLivestock. Stored in the projection the regulation is read in, with area computed from the boundary rather than typed in beside it
  • A due diligence statement that freezes the boundary it was made againstDoneLivestock. The statement carries a hash binding that boundary to its subject and period, so a later edit cannot be presented as the original
  • The same, for cropNot yetNot built. The statement's subject today is an animal or a batch — there is no crop due diligence statement to show you
  • Lodging a filing with TRACES, or with the GLOBALG.A.P. databasePartialThe seam exists and a submission is recorded as queued. Without provisioned gateway credentials it stays queued and is never marked accepted on our own say-so
  • A SIZA exportNot yetNothing is built. SIZA appears on this site as industry context, and context is not a capability
  • Lot custody and the audit pack, end to endPartialThe lot register has no server loader, so it is one device's view. Stated the same way on who the platform serves
  • Issuing a certificate, or a determination that an audit is metRefusedCertificates come from accredited bodies. A system of record that certifies its own output is worth nothing to the party relying on it

03

A pack whose every figure names the record it came from

This is what assembling evidence from the operating record buys, and it is the only part of the argument that a reviewer can test directly. Each figure keeps its provenance: a tonnage is the weighbridge entry that produced it, a product and dose is the application record and the person who chose it, a block is the boundary as it stood in that season rather than as it stands today.

Where the record cannot answer, the pack says so and names what is missing. That is the same rule as everywhere else here — a figure that was declared stays labelled as declared, and a blank is never left to read as a zero.

Every figure in the pack carries a line back to the record that produced it. Where no record answers, the pack states that in words — a blank reads as a zero, and a zero is a claim nobody made.

Sources

  1. The EU Deforestation Regulation applies to operators that are large or medium enterprises, and to downstream operators and traders of every size, from 30 December 2026 — and from 30 June 2027 for natural persons and micro-enterprises. European Commission — Access2Markets, on Regulation (EU) 2025/2650 · verified 2026-08-15
  2. Article 9 requires an operator to collect the geolocation of all plots of land where the commodity was produced, with the date or time range of production, alongside the quantity, the country of production, and the name and address of both the supplier and the party supplied. European Commission — EUDR implementation, “Understand due diligence” · verified 2026-08-15
  3. A GLOBALG.A.P. add-on lets a producer combine the SIZA Environmental and IFA audits rather than running them separately. GLOBALG.A.P. — Sustainability Initiative of South Africa · verified 2026-08-13
  4. SIZA recorded 147 environmental audits in Q2 of its 2025/26 year, 83 more than the same quarter a year earlier. SIZA — Monitoring & Evaluation report, Q2 2025/26 · verified 2026-08-13